
IEC 61508: Proof Testing and the Proof-Test Interval
We've walked the whole safety lifecycle, from hazard analysis down to the wiring in the field. Now zoom all the way in, past the block diagrams, to a single line item in your maintenance plan: the proof test. Here's the uncomfortable truth the standard forces you to face. Part of the Critical Systems Analysis functional-safety series on IEC 61508. In this episode: Let's open the part of IEC 61508 that deals with periodic proof testing, and how that testing feeds straight into your failure-on-demand math. So what is a proof test, in the language of the standard? It's a test you run on a schedule to reveal the dangerous failures that have piled up unseen, and to bring the function back to an as-good-as-new condition. First, find the subject. Now classify how that hardware fails, using the taxonomy the whole standard runs on. Here's why proof testing exists at all. Picture the risk over time. Reference: Proof test is a defined term in IEC 61508-4 (Part 4, definitions/abbreviations). I described the concept (periodic test to reveal dangerous-undetected faults and restore the functi More in this series: IEC 61508 — Functional Safety Foundations | Functional Safety Assessment and Services Explore more from Critical Systems Analysis. Partner with us Follow on LinkedIn Visit our website Read our feature on Automate.org All shows on Apple Podcasts: AI & ML Safety | Fault Tree Analysis | FS Assessment | Safety Analysis | IEC 61508 | IEC 62443 | ISO 10218 | ISO 12100 | ISO 13849 | ISO 26262 | ISO/PAS 8800 | ISO 26262-11 | V-Model | UL 4600.


















