
EP 85: Aarya Borele from Evardi Energy
Utilities are drowning in paperwork long before a repair crew ever leaves the yard. Aarya Borele, co-founder and CTO of Evardi Energy, walks John and Bobby through outage requests getting rejected a day out, FERC 881 pushing line ratings from seasonal to hourly, and why 95 percent accuracy is a failing grade when the lights are on the line. Also in here: the grid as cloud infrastructure, Griddy's flameout, and a 49ers conspiracy theory involving a substation. Click here to watch a video of this episode. Join the conversation shaping the future of energy. Collide is the community where oil & gas professionals connect, share insights, and solve real-world problems together. No noise. No fluff. Just the discussions that move our industry forward. Apply today at collide.io Click here to view the episode transcript. 0:00 Agents, VMs and running everything at once 3:26 Back in the studio 4:34 What Evardi does 5:45 Uri and the incentive problem 10:28 When the ISO rejects your outage 12:35 How the grid actually works 15:02 FERC 881 and hourly line ratings 17:46 Where Evardi fits in 21:37 Blackouts in India and Kenya 25:28 The grid as cloud infrastructure 30:17 Griddy and the wholesale gamble 33:45 The stack, compliance and weather models 37:40 Accuracy in critical infrastructure 40:22 Jargon, bad data and context 45:56 Models, local hosting and token costs 55:29 The 49ers substation theory 57:13 Speed round 1:05:38 Physical AI and robot ducks 1:11:25 Paying attention in a granola world 1:14:09 The ask https://twitter.com/collide_ai https://www.tiktok.com/@collide.io https://www.facebook.com/collide.io https://www.instagram.com/collide.io https://www.youtube.com/@collide_io https://bsky.app/profile/collide-ai.bsky.social https://www.linkedin.com/company/collideai
- Transcript

















