The industry loves counting charging ports. But a port doesn't mean much if the power behind it is stranded, the system is overbuilt, or the whole site depends on a cloud connection staying up.
Jason Cortes sits down with Tyler Hughes, CEO, and Brian Breniser, CTO, of Positron Charging. Tyler is a professional electrical engineer who spent a decade building electrification teams, most recently as national electrification lead at WSP. Brian is a software developer with cloud, embedded, and Red Hat experience, and an EV enthusiast since 2005. Together they're tackling the question most Level 2 deployments run into: why does one charger cost so little, and hundreds cost so much?
Tyler explains the "branching problem." Most multi-port installs lock power into dedicated circuit paths, so when one car finishes, its capacity sits idle while the car next to it waits. Positron borrowed an idea from telecom, the multiplexer, and built a patented many-in, many-out AC switch bus that routes available power to whichever charger needs it.
The team also gets into the code. Under NEC 625.42, upstream infrastructure has to be sized as if every charger runs at once, unless an automatic load management system is in place. Most of those systems live in the cloud, so when connectivity drops, many authorities having jurisdiction require the site to be sized as if there were no load management at all. Tyler walks through how that pushes a fully installed charger from $10–15K to $27–30K at scale, and how a 200-charger apartment project can reach $6 million in infrastructure. Positron's answer is hardware-first and local-first, so the connected load is always the managed load.
From there, the conversation moves to operations: rotating every car to 80% before topping anyone off, letting drivers set departure times, letting the front desk reset a charger without a truck roll, and swapping a $50 cable instead of a whole charger.
In this conversation:
- The branching problem and stranded capacity
- Borrowing the multiplexer from telecom
- Why multifamily housing is the ultimate target for Level 2
- What port counts don't tell you about usable power
- NEC 625.42, connected load, and managed load
- Why per-charger costs nearly double at scale
- Charging everyone to 80% first
- Driver schedules, priority charging, and remote resets
- Total cost of ownership vs. the cheapest charger
- The risks of cloud-dependent load management
- Inside the EVPDS: Positron's EV power distribution system
- Brownfield retrofits vs. greenfield builds
- Why "AI-powered" charging is often just a priority queue
Think about the whole system: the user, the car, the panels, the switchgear, the transformers, and the communication between them. Not just what's fastest to install.
CONNECT WITH POSITRON CHARGING
Web: positroncharging.com
LinkedIn: Tyler Hughes · Brian Breniser
ABOUT FIELD FREQUENCY
Field Frequency is powered by Field Advantage, an IT field services company specializing in the service, maintenance, and operational reliability of EV charging infrastructure. Every episode, we sit down with the operators, founders, and veterans actually keeping this industry running.